2857 - click to open larger image in a new window

2857 coasting through Eardington Station. Summer 1991. Photo: Paul Bennett

 

April 2006

2857

More remarkable progress by the 2857 Society volunteer boilersmiths over the last few months. Smokebox removed, smokebox tubeplate removed, copper tubeplate removed and almost all the crown stays fitted.

2857

 

2857

Platework for patches over the shoulders of outer firebox are being prepared before a good deal of heat and force is applied to form these to shape.

2857

The new sections of the firebox wrapper have been welded in place.

 

September 2005

Work continues overhauling the boiler in Bridgnorth boiler shop.

2857 - click to open larger image in a new window

2857 - click to open larger image in a new window

The lower section of the firebox wrapper has been cut out ready to be replaced with new plate. The old piece lies on top - the grooving above the foundation ring can just be seen.

 

 

2857 - click to open larger image in a new window

Tapping out the crown stays - the satisfying 'T' is painting on after each is complete!

2857 - click to open larger image in a new window

View of the firebox crown. The tap can just be seen coming through - 3rd row up, halfway along.

 

April 2005

2857 - click to open larger image in a new window

Undergoing conversion into an A4 to match the coach behind?? A temporary protective canopy frame work has been built over the loco frames. The front running plate over the front drag box area has been rebuilt and stripping, cleaning and painting continues.

2857 - click to open larger image in a new window

Churchward 3500 gallon tender. The tank is an all new construction faithfully following the original.

 

 

 

 

 

2857 - click to open larger image in a new window

2857 Society volunteers work on the boiler inside Bridgnorth boilershop preparing the foundation ring for removal. There's been a great deal of progress with the boiler over the last year with most of the 700+ side stays now removed.

April 2004

2857 - click to open larger image in a new window

The frames back at Bewdley after front drag box repairs at Bridgnorth. The cylinder shine after a coat of aluminium heat resistant paint.

 

2857 - click to open larger image in a new window

The boiler has been lifted at Bridgnorth and placed on a Weltrol wagon in the boilershop ready for work to start.

 
 