5164 Overhaul
A few pictures of 5164 under overhaul at Bridgnorth, April 2003.
Entirely new side tanks have been constructed in the Bridgnorth boiler shop. Only the fittings from the old ones have been re-used, everything else is completely new.
Wheel set in Bridgnorth's wheel lathe for tyre turning. |
|
Boiler, inverted, in Bridgnorth boiler shop.
Cab roof, also upside down, with back sheet removed for repair.
|