9103 Restoration - 2004
Details of the ongoing restoration work throughtout 2004.
Further restoration progress at:
|
November 2004
|
|
|
|
|
One of the heavy cast table legs
for the tables running down the center of each saloon.
The lino has also been laid but currently rather dusty!
|
|
|
The communication cord along the corridor
attached the recently grained and varnished pelmet mouldings.
|
The recently installed communication gear
on the south end of the coach. The gear is routed over the
top of the corridor connection to connect both communication
cords to the train pipe valve box. The left-hand hand rail
is fitted and the pairs of holes mark the positions for
the steps.
|
|
Don Keeling and Ken Russell working on
the panels at the south end of 9103.
|
|
September 2004
- The lino is now installed, late September.
- The communication cord end mechanism is being installed.
- The window droplights straps have arrived and leather
handles for brakevan are on order.
- Problems fond with end step bolts have caused some rework
before corridor connections can be installed.
- 'Boomerang' modifications to corridor connections are
being made to permit connection to the Gresley set. The
boomerang is the piece of metal added to the top of the
corridor connection to ensure it cannot become locked
inside a Gresley Pullman Connection. Although not GW,
the coach did have Pullman adaptors and will ensures flexibility
in traffic use.
- Paneling in the corridor will be grained shortly.
|
New castings for the toilets in 9103. An
extra 4 sets have also been cast for 6045 and 650. Now we
have to get them machined and Pete Simpson will be kept
busy for a few months.
|
|
|
|
|
Pattern and the brass castings for the
table hinges for the long central tables in the saloon of
9103. Extra sets have also been cast to fit out 9055 and
9369 as well.
|
|
June-August 2004
- Fitted the remaining running board on the East side
of the coach.
- Made some repairs to the floor and preparing it to receive
the new linoleum - due in early September.
- Painting the floor with floor paint under where the
seats will go.
- 'Finding' and repairing the Communication Cord gear
for the South end, preparing to fit it before the corridor
connections are replaced in the Autumn.
- Reinstated the external bolts for the grab handles
in readiness for completing the scumbling on the corridor
walls.
|
|
June 2004
|
|
|
Restored doors for the Lavatory and connecting door
between the two saloons.
|
|
|
Colin Jenkins skillfully signwriting
the solebar of 9103.
|
|
May 2004
Present activities are centred around installing new corridor
canvasses, completing the running boards and repairing the
floor to take new linoleum before completion of the scumbling
of the corridor. Also the toilet flushing mechanisms.
|
|
|
|